The rain has stopped for a couple of days so progress can continue smoothly.
The steel is down and the slab is just about ready to be poured. We have added a layer of 40mm polystyrene (Sagex) underneath the slab for insulation. A home loses a lot of heat through its floors into the earth. The Sagex prevents a lot of this heat loss ensuring a more energy efficient home.
Before pouring the slab we also need to lay the conduits for the electrical and other points. The conduits for the various plug points and switches need to be set into the slab to prevent having to chop and grind through the concrete at a later stage.
We can only hope that we haven’t overlooked anything at this point.