Main Bedroom

The slab is set and the walls are going up quickly. The wet conditions right after laying the slab were perfect for curing the concrete. Now that the sun is out the work on site is happening quickly and smoothly.

As the windows are placed in position they frame the views – it’s a great process to see what and where the windows will be framing – so much so that I have moved one of the windows over slightly to adjust the view from my bed.

Final Slab

It’s been a few weeks since the last update. Bedroom 2 has started taking shape and the walls have gone up.

The last few weeks have been spent prepping the final slab for the main bedroom. The slab also forms the ceiling of the lounge & dining area.

The usual steel and conduiting was laid. There have been many decisions regarding lighting and electrical points as most of these have to be cast into the slab. There were some oversights in the last slab that will have to be corrected – additional lights will need to be core drilled into the slab.

Plumbing has also been a discussion and wether to lay water pipes into the slab or not was a debate between plumber and engineer, engineer triumphing.

The steel I-beams have been installed and the slab rests on a series of steel posts that rise from both the I-beams and the walls. The only  problem that we foresee is the positioning of the glass on the I-beams. There is very little tolerance where the glass passes the posts, exasperated by the welding joints that make it difficult to place any brackets around that area.

Hopefully the glazing guys will be able to figure that one out.

The slab was poured today – another sunny winters day – and it all went really well. This slab was probably the most tricky part in the design and construction process of my home.