Slab poured

The weather played along and after many tweaks to the steelwork, the engineer, Andy Cowie (CDA Design CC) , cast his final critical eye over everything and gave it his thumbs up – the concrete was poured onto the second floor slab.

An additional beam was added above the garage and had to be poured at the same time. The beam construction delayed the pour by a few days but the schedule still seems to be reasonably intact. Next step is walls for bedroom 2 and the framework and scaffolding for the remaining slab and concrete walls.

There are still some critical decisions to be made regarding doors, windows and other details that are now starting to creep into the whole process as we get closer to getting all the wetworks in place. It seems like houses are made out of bricks, mortar and many many decisions.

To see the progress of the site from start to current status check out: Progress in Pictures

World cup news: Bafana Bafana exited the world cup in style today. They played brilliantly and left the country with a feeling of a job well done. There have been some great games including an amazing 7-0 win to Portugal which I had the pleasure of witnessing live at the Greenpoint Stadium.

Slab Prep work

There has been more prep work for the slab – laying of conduits, prepping the holes for the skylights, putting in the boxes for the downlighters etc. the steel has all been placed and after some last minute changes to the design of the landing and other refinements we are just about ready to pour the slab.

The supports for the main bedroom slab have also been put in place and the various conduits and water & sewerage pipes have been threaded through the steel poles.

The weather has been up and down and looks to be wet for the coming week.

In between all of this we have just entered a very exciting time  – The World Cup! It’s been an exciting weekend and the energy in the country is at an all time high. Bafana Bafana did well to walk away with a draw to Mexico – it’s a great time to be a South African!

Hopefully the weather won’t dampen the spirits at the Italian game tomorrow (Forza Italia!)

And hopefully the weather won’t disturb the slab laying schedule this week.

Moving on & up

It’s been a  few weeks since the last post. I was away on holiday for 2 weeks and was pleasantly surprised to see that the ground floor walls are all pretty much done. The formwork for the first slab is busy being erected and soon we will be going up to the next level. The pace has been amazing and I can now really start getting a sense of the space. It’s getting more exciting, and more expensive, as we move along.

There have been very few hiccups – the only and more recent one is a door that needs to be moved as it does not allow enough space for a kitchen counter.

Other than that – window and door frames are in, the weather is playing along and it’s full steam ahead!